EXPLORE THE STORY · 4 MIN READ
🔌 San Jose, California, United States — DG Matrix introduced Interport 360 Flex at the OCP Global Summit held on October 12–15, 2026. The system is designed to convert medium- or low-voltage AC supplies into 800 VDC for AI data centres. The company states that AC inputs up to 34.5 kV are supported.
For beginners, AC changes direction periodically; DC flows in one direction. “800 VDC” describes the DC voltage, not the system's power capacity. A solid-state transformer uses controlled power-electronic conversion and electrical isolation to manage energy transfer. It should not be confused with a conventional transformer simply connected to a DC supply.
Inside the announced design, silicon-carbide semiconductor modules use liquid cooling. Modules are assembled into outdoor skids that can be connected in parallel as capacity grows. DG Matrix says its controls coordinate the conversion modules, storage and power sources. Storage is intended to help smooth rapid changes in AI workload demand.
The practical engineering issue is matching the supply system to a fast-changing load while controlling voltage and protecting equipment. The announcement describes an architecture and its stated functions; it does not establish independently measured efficiency, savings or performance at every installation.
THE ENGINEERING CORNER
MVA is a capacity clue—not a promise at the socket
A transformer’s megavolt-ampere (MVA) rating describes apparent power. Megawatts (MW) describe active power. They are related through power factor; the two numbers should not be swapped without stating that assumption.
Try a simple example: an illustrative 100 MVA load operating at 0.90 power factor corresponds to 90 MW. That calculation describes the assumed operating point, not a guaranteed continuous output, a utility’s available generation or a measured project result.
Ask what constrains the complete path: the incoming network, transformer, busbars, outgoing circuits or downstream demand. Adding nameplate capacities across several substations also does not establish how much can reach one particular load. Network arrangement, equipment limits and operating conditions still matter.
The useful habit is to separate three statements: what equipment is rated to carry, what the network can transfer under the studied conditions, and what customers actually receive. An equipment announcement normally establishes only part of that picture.
THE ENGINEERING CORNER
Follow the whole power path
Think of a substation project as one part of a connected power path. There is a supply side, the equipment being discussed, and a demand side. Each part has its own capabilities, constraints and operating conditions.
A headline about new capacity is therefore a useful starting question: where was the original bottleneck, and which part of it does this project address? More installed equipment does not, by itself, quantify customer reliability, actual energy delivered or the capacity available during an outage.
Planning language matters too. A preferred site, a contract award, equipment delivery, installation and commissioning are different milestones. Do not read an announced plan as an asset already operating. The source should support the particular stage being described.
To make the story useful, sketch a simple supply-to-load chain and place the named asset on it. Mark what the report establishes and leave unknown interfaces as questions. That small exercise helps a fresh engineer connect project news with system thinking without inventing voltage levels, settings, test results or customer benefits that the announcement does not provide.
THE ENGINEERING CORNER
Read the application before the product list
A company profile can introduce useful equipment families, but the engineering assessment starts with the duty. Identify what the device must do, the system it will connect to, and the conditions it must withstand. Similar-looking products may serve different applications.
Build a short comparison table from the relevant manufacturer documentation: intended function, electrical ratings, interfaces, environmental limits and the stated test or conformity evidence. Keep the document revision beside the figures so that a later change is visible.
One useful distinction: a manufacturer’s portfolio statement is not the same as approval of a particular model for a particular project. Likewise, the presence of a product category on a website does not establish every voltage rating, certification or service capability you might need.
For a substation application, follow the interface with the rest of the scheme. Equipment selection involves how a device works with measurement, control, protection and the connected circuit. The aim is to turn a broad product description into specific questions that can be answered from the exact model’s current documentation.